Today is Saturday. 18th June 2011, What am I doing exactly?, well just writing something to fulfill my time in the office. Yeah. Overtime. Lots of work, (well not that plenty though).
So to squeeze things up let's check on something random. Let's us see now.....oh okay why don't I post some of my pictures (well it's work related) to start with.
All the Technical staff posing right behind the Offshore Module. This photograph was taken last year during the peak of the project.
This is the part of the project that I'm responsible to monitor and inspect till the end of the project. E & E room. Structurally wise the whole item and its structural component weighs almost 30MT. A little bit tinier compare to the one on the background. Talking about major versus minor hehehehe.
Next is the Transformer Shelter. Looks odd and more resembling a steel caged toilet with no or limited ventilation system. Yup, looked at the welding condition below and the edge of the floor. Poorly done and not neat.
Other side view of E & E room. Structural item nearly done, it's time to install and precomission all the E & E item,s internally & externally. Those bundle wrapped with plastic covers are HVAC equipment. Scafffoldings temporarily erected to install those items and finally the lifting lugs for lifting purposes. (not yet installed).
Part 2 to commence soon......got to get back to work.....survallience sights under constant monitoring.......
So to squeeze things up let's check on something random. Let's us see now.....oh okay why don't I post some of my pictures (well it's work related) to start with.
All the Technical staff posing right behind the Offshore Module. This photograph was taken last year during the peak of the project.
This is the part of the project that I'm responsible to monitor and inspect till the end of the project. E & E room. Structurally wise the whole item and its structural component weighs almost 30MT. A little bit tinier compare to the one on the background. Talking about major versus minor hehehehe.
Next is the Transformer Shelter. Looks odd and more resembling a steel caged toilet with no or limited ventilation system. Yup, looked at the welding condition below and the edge of the floor. Poorly done and not neat.
Other side view of E & E room. Structural item nearly done, it's time to install and precomission all the E & E item,s internally & externally. Those bundle wrapped with plastic covers are HVAC equipment. Scafffoldings temporarily erected to install those items and finally the lifting lugs for lifting purposes. (not yet installed).
Part 2 to commence soon......got to get back to work.....survallience sights under constant monitoring.......